Panasonic FP7 User Manual page 130

Multi input/output unit
Hide thumbs Also See for FP7:
Table of Contents

Advertisement

10.3 Initial Operation Check
Items to check after turning on the power
No.
Item
Checking the installation of
(1)
the external safety circuit
Checking the safety circuit
(2)
by the PLC unit
Checking the near home
(3)
input and home input
Checking the rotation,
(4)
moving direction, and
moving distance.
10-14
Description
Check to make sure the safety circuit (wiring and installation of over
limit switch) based on an external circuit has been installed securely.
Check the connection between the unit and over limit switches. Check
the installation condition of the over limit switches.
Check if the near home input and home are loaded as the inputs of the
PLC and activated properly by performing JOG operation or home
return operation.
Check the rotation, moving direction and moving distance by
performing JOG operation or positioning operation.
WUME-FP7MXY-06

Advertisement

Table of Contents
loading

This manual is also suitable for:

Afp7mxy32dwdAfp7mxy32dwdh

Table of Contents