Installing Cables - Huawei FusionPower6000 3.0 User Manual

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 4-48 Installing the remaining PC partition panels for the 1000 mm wide
maintenance bypass cabinet
Step 10 Install the top panels for the enclosure frames.
Reinstall the PC protective panels of enclosure frames if the panels are removed
during copper bar installation.
Figure 4-49 Installing a top panel
----End

4.8 Installing Cables

Issue 03 (2023-02-08)
NO TICE
NO TE
The cable colors shown in the electrical connection diagrams provided in this section are for
reference only. Select cables in accordance with local cable specifications. (Green-and-
yellow cables are only used for protective grounding.)
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
129