Installation And Cable Connection; Installation Site Requirements - Huawei FusionPower6000 3.0 User Manual

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
4
Wear dedicated protective gears and use insulated tools to avoid electric shocks or
short circuits.

4.1 Installation Site Requirements

4.2 Installation Preparations
4.3 Cabinet Transportation, Unpacking, and Checking
4.4 Installation Process
4.5 Installing Cabinets
4.6 Installing Enclosure Frames
4.7 Installing Copper Bars
4.8 Installing Cables
4.9 Installing Compensation Modules
4.10 Installing UPS Power Modules
4.11 Installing a PAD
4.12 Verifying the Installation
4.13 Sealing Cabinets
4.1 Installation Site Requirements
Issue 03 (2023-02-08)

Installation and Cable Connection

D ANGER
L indicates the FusionPower6000 width, which is calculated based on the
cabinet layout of the FusionPower6000.
Based on the weight of each cabinet, planned installation positions, and
number of cabinets, check that the load bearing capacity of the support
surface meets the deployment requirements.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
81

Advertisement

Table of Contents
loading

Table of Contents