Figure 4-58 Pre-routing parallel cables (using four parallel UPSs as an example)
Step 2 (Optional) If phase synchronization is required, pre-route the UPS BSC cables and
reserve the BSC cable ports near the BSC ports.
Figure 4-59 Pre-routing BSC cables
(1) UPS for route A of FusionPower6000
Step 3 Install dry contact signal cables between the maintenance bypass cabinet and the
UPSs.
Issue 03 (2023-02-08)
NO TE
● For a parallel UPS system for IT load, connect the BSC cable to any IT UPS.
● For the UPS for mechanical load, connect the BSC cable to this UPS.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(2) UPS for route B of FusionPower6000