Power-On Commissioning; Power-On Commissioning Process - Huawei FusionPower6000 3.0 User Manual

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)

5.1 Power-On Commissioning Process

5.2 Performing Insulation and Dielectric Strength Tests
5.3 Powering On the Low-Voltage System
5.4 Commissioning a UPS
5.5 Commissioning UPSs in a Parallel System
5.6 (Optional) Commissioning the Dual-Bus UPS System
5.7 Commissioning the Maintenance Bypass Cabinet
5.8 Commissioning Feeder Switches
5.9 Networking Commissioning
5.10 Powering Off the Low-Voltage System
5.11 Powering On the System
5.1 Power-On Commissioning Process
● Wear dedicated protective gears and use insulated tools to avoid electric shocks
● After the preset password is used for the first time, change the password in
● Before power-on commissioning, ensure that all check items in the section
Issue 03 (2023-02-08)
5
CA UTION
or short circuits.
time to improve account security and prevent unauthorized network attacks,
such as data tampering. Losses caused by failure to change the password in a
timely manner or forgetting the password after the change are not covered
under warranty.
"Verifying the Installation" are complete.
Copyright © Huawei Digital Power Technologies Co., Ltd.

Power-On Commissioning

5 Power-On Commissioning
155

Advertisement

Table of Contents
loading

Table of Contents