Step 1 Mark mounting holes for the cabinets based on the actual layout.
Figure 4-5 Dimensions of holes at the bottom
(A) Bottom of the 2200 mm wide transformer
cabinet
(C) Bottom of the 1200 mm wide cable inlet
and bus tie cabinet (separate or combined)
(E) Bottom of the 800 mm wide cable inlet and
bus tie cabinet (separate or combined) and
maintenance bypass cabinet
(G) Bottom of the 600 mm wide cable inlet
and bus tie cabinet (separate) and
maintenance bypass cabinet
Step 2 Install expansion sleeves for expansion bolts.
1.
Issue 03 (2023-02-08)
Mark mounting holes for the transformer cabinet based on the hole
dimensions at the bottom. You are advised to mark four mounting holes close
to the front and rear doors.
Mark mounting holes for the UPS and feeder cabinet using a marking-off
template. You are advised to mark the four mounting holes on the inner side.
Mark four mounting holes for other cabinets using their marking-off
templates.
Drill a hole into the concrete floor using a hammer drill.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(B) Bottom of the 2000 mm wide transformer
cabinet
(D) Bottom of the 1000 mm wide cable inlet
and bus tie cabinet (separate or combined)
(F) Bottom of the 800 mm wide UPS and
feeder cabinet
(H) Bottom of the 600 mm wide feeder cabinet