Step 5 Prepare for testing the feeder cabinet.
1.
2.
Issue 03 (2023-02-08)
Prepare for testing the MCCB output modules.
a.
Check that the MCCB output module switches are OFF.
b.
Mark the corresponding port names at the cables on the panels of the
branch monitoring modules, and remove the cables (if any).
c.
Remove the protective covers.
d.
Remove all branch monitoring modules.
e.
Remove all MCCB output modules.
Figure 5-6 Removing MCCB output modules
f.
Remove the cable from the J306 terminal on the branch monitoring
backplane of the first MCCB output module (QF1) in the cabinet.
g.
Remove the cable from the J310 terminal on the branch monitoring
backplane of the last MCCB output module (QF
h.
Remove cables from the J311 terminals on all branch monitoring
backplanes.
i.
Determine the switch status of the MCCB output modules based on the
test coverage.
If the test does not involve loads, the preparation is complete.
If the test involves loads, reinstall all MCCB output modules and turn
on the switches.
Pull out the interface board and PSU of the centralized monitoring module for
about 150 mm and record them.
Mark the corresponding port names on the power cable and voltage sampling
cable at the rear panel of the centralized monitoring module, remove the
cables, and record them.