Huawei FusionPower6000 3.0 User Manual page 143

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 4-60 Installing dry contact signal cables (using four parallel UPSs as an
example)
(1) XT3 terminal block in the maintenance
bypass cabinet
(3) Dry contact card and monitoring interface
card in UPS 2
(5) Dry contact card and monitoring interface
card in UPS 4
Step 4 Install the ECC800-Pro.
1.
2.
3.
4.
Issue 03 (2023-02-08)
Connect the power cables to the ECC800-Pro.
Secure the ECC800-Pro to the installation position at the bottom of the IT
maintenance bypass cabinet.
Install the WiFi module.
Install the ECC800-Pro ground cable.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
(2) Dry contact card and monitoring interface
card in UPS 1
(4) Dry contact card and monitoring interface
card in UPS 3
136

Advertisement

Table of Contents
loading

Table of Contents