UPS2000-A-(6 kVA-10 kVA)
User Manual (App)
Figure 4-6 Placing the UPSs and batteries
Step 4 Install rubber plugs.
Figure 4-7 Installing rubber plugs
----End

4.3 Installing Cables

Cables are installed in the same way for the 6 kVA and 10 kVA models. This
section uses the 6 kVA model as an example.
Issue 02 (2024-01-30)
NO TE
● You are advised to lay out the UPS horizontally, install battery cables, and then place
the UPS on the support base.
● For tower-mounted installation, you are advised to place batteries on the left side of the
UPS.