Huawei FusionPower6000 3.0 User Manual page 129

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 4-37 Installing a PC partition panel that passes through the vertical copper
bars and a vertical PC partition panel for the 1000 mm wide maintenance bypass
cabinet
(1) Vertical PC partition panels
on both sides
Figure 4-38 Installing a plastic buckle
Figure 4-39 Installing a PC partition panel between the maintenance bypass
cabinet and the feeder cabinet
Step 6 Install the second layer of vertical copper bars.
Issue 03 (2023-02-08)
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) Vertical PC partition pane
in the middle
4 Installation and Cable Connection
(C) PC partition panel that
passes through the vertical
copper bars
122

Advertisement

Table of Contents
loading

Table of Contents