Huawei FusionPower6000 3.0 User Manual page 134

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 4-44 Second-layer horizontal copper bars and bus clips (3)
(A) Utility power feeder
cabinet
No.
a
b
c
d
Step 8 Clean up the foreign matter on the top of the cabinets and remove dust.
Step 9 (Optional) Install PC partition panels between the two layers of horizontal copper
bars (2).
Issue 03 (2023-02-08)
Combination
Bus clip
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) UPS cabinet for mechanical
load
4 Installation and Cable Connection
(C) Maintenance bypass and
feeder cabinet for mechanical
load
Copper Bar
Screw Details
No. and
Related Part
28
M12x55, 4
PCS
29
M12x55, 4
PCS
30
M12x55, 4
PCS
Bus clip
Screw
delivered with
delivered with
the enclosure
the bus clip
frame
127

Advertisement

Table of Contents
loading

Table of Contents