FusionModule500 Smart Mini Data Center
Quick Guide
Issue: 02
Date: 2020-12-25
Huawei Technologies Co., Ltd.

Advertisement

Table of Contents
loading

Summary of Contents for Huawei FusionModule 500

  • Page 1 FusionModule500 Smart Mini Data Center Quick Guide Issue: 02 Date: 2020-12-25 Huawei Technologies Co., Ltd.
  • Page 2: Product Overview

    Component Onsite Installation ECC800-Pro Not required Not required Lithium battery Required 3.5 kW split-type air Required conditioner Water sensor Required Temperature and humidity Required (T/H) sensor Copyright © Huawei Technologies Co., Ltd. 2020. All rights reserved.
  • Page 3: Installation Scenarios

    Installation Scenarios Outdoor Unit Installation Scenario • If the outdoor unit is placed higher than the indoor unit, the maximum height deviation between them should be less than or equal to 20 m. Install an oil trap every 6 m to 7.5 m along the gas pipe in the vertical direction to ensure system reliability.
  • Page 4: Hardware Installation

    Hardware Installation Installing the Cabinet 1. Determine the cabinet position based on the engineering layout diagram. 2. Place the cabinet at the correct installation position. 3. Level the cabinet using a wrench. • Use a measuring tape to check that the vertical distance between the top of the 2000 mm high cabinet and the floor is 2000 mm (+3 mm).
  • Page 5 The baffle plate height and width should be greater than or equal to the outdoor unit height and width, respectively. • If the site installation environment is complicated and the preceding conditions are not met, contact Huawei technical support.
  • Page 6 Space Requirements Clearance from the wall: > 300 mm Clearance from the Clearance from the wall: > 500 mm wall: > 300 mm Air exhaust side: > Air intake side: > 2000 mm 150 mm 1. Determine the four mounting holes of the outdoor unit and drill holes in the concrete base.
  • Page 7 Connecting Pipes Lay out pipes based on site requirements and the following principles: • The length of a pipe should be as short as possible. The recommended length is within 10 m. Avoid unnecessary turnings, lifting, and falling. • Minimize the height difference between the indoor and outdoor units. •...
  • Page 8 Connecting a Water Pipe Top Piping Bottom Piping 1. Connect the drainpipe. 1. Connect the drainpipe connector to the other end of the drainpipe. 2. Remove the baffle plate from the water pipe hole at the bottom of the cabinet, and install the drainpipe. •...
  • Page 9 Installing Cables L+N+PE~220 V Customer's power distribution cabinet Outdoor unit Indoor unit Primary power supply Outdoor unit power supply • To ensure personal safety, ensure that the metal shell of the smart cooling product is properly connected to the ground electrode after installing the product. Ground the smart cooling product properly during installation.
  • Page 10 Nitrogen Injection, Pressure Preservation, and Vacuumization 1. Open the stop valve for the gas pipe of the indoor unit. 2. Connect the pressure gauge, rubber hose, and nitrogen cylinder. Ensure that the outlet pressure of the reducing valve is less than or equal to 3.5 MPa. 3.
  • Page 11 Installing Power Supply and Distribution Devices 12.1 Installing Lithium Batteries Install Busbars 1. Push a lithium battery into the cabinet and secure it. Installing PDU2000s • If there is more than one lithium battery, install busbars. • The busbars need to be installed 2 U above the last lithium battery.
  • Page 12 Installing Monitoring Devices 10.1 Installing the SIM Card and Antenna 1. Remove the ECC800-Pro main control module. 2. Install the SIM card. 3. Attach the antenna to the middle of the cabinet top. 4. Connect the antenna cable. 10.2 Installing a PAD 1.
  • Page 13 10.4 Routing the Cable to a WLDS900 Water Sensor Ensure that the water detection cable has no contact with metal. Otherwise, an alarm will be generated. Take protective measures when routing the water detection cable. 1. Bind the water detector to the 5th U position on the left mounting bar of the cabinet rear door.
  • Page 14 3. Secure the mounting plate to the top 4. Adjust the camera. of cabinet front door. 5. Install the transparent cover. 10.7 (Optional) Installing a LAN Switch 1. Install guide rails and floating nuts. 2. Secure the LAN switch. 3. Connect the power cable of the LAN switch.
  • Page 15 10.8 (Optional) Installing a VCN510 Remove the upper cover of the chassis. 1. Install hard disks. Remove screws. Install the hard disk screws. Install the SATA cable and power cable. (1) SATA cable (2) Power cable Ensure that the metallic plate of the SATA cable faces upward.
  • Page 16 (1) No. 1 disk installation position (2) No. 0 disk installation position Secure the hard disk at the rear of the chassis. Install a hard disk in No. 0 position in the Secure the VCN510 to the 19th U and same way.
  • Page 17 10.9 (Optional) Installing a IVS1800 1. Install hard disks. a. Remove the two black screws on the rear of the chassis cover, and take off the chassis cover。 b. Remove two black screws on each side of the chassis and the silvery white one on top of the hard disk tray, raise the hard disk tray by 45 degrees, and take out the upper and then lower layers of hard disk tray.
  • Page 18 e. Connect data and power cables to hard disks. Connect hard disk cable ports P0–P3 to hard disks on the lower-layer hard disk tray and ports P4–P7 to hard disks on the upper- layer, as shown in the lower left figure.。 f.
  • Page 19: System Cabling

    System Cabling Grounding the Smart Module Connecting the Power Cables of the Cabinet Bottom Cabling Top Cabling Connect input power cables to Connect input power cables to the power distribution unit. the power distribution unit. Connecting PDU2000 Power Cables...
  • Page 20 Connecting Cables Between Lithium Batteries and the UPS 1. Connect cables between lithium 2. Connect cables between the busbars batteries and busbars. and the power distribution unit. 3. Connect cables between the power distribution unit and the UPS. 4. Connect communications cables between lithium batteries and the UPS.
  • Page 21 Connecting VCN or IVS1800 Cables VCN510 (1) Ground terminal (2) GE1 port (3) GE2 port (4) Power button (5) Power port IVS1800 1. Connect one end of the ground cable to the grounding terminal of the device and the other end to the grounding point of the network cabinet.
  • Page 22: Verify The Installation

    Verify the Installation Item Check That Check Result The cabinet position is consistent with the equipment room layout □ Passed □ Failed diagram. All bolts and screws are firmly tightened, especially on electrical connections. Flat and spring washers are used with each bolt, and □...
  • Page 23: Power-On Commissioning

    PDB. more than 12 hours. Otherwise, the compressor may be 2. Commission the system after faulty, and Huawei will not be liable for any loss caused the electric heating belt of thereby. the crankcase has been...
  • Page 24 5. Log in to the ECC800-Pro WebUI. Change the password immediately after the first login. Preparations and App Login 1. Log in to Huawei AppGallery (http://a.vmall.com/), search for FusionModule, and tap Download to obtain the installation package. 2. Install the app.
  • Page 25 Record the values of Barcode and Verify Code in the displayed Startup Password dialog box. c) Within 24 hours, inform Huawei technical support of Barcode and Verify Code to obtain the password. After obtaining the password, enter the password in the Password text box and click Submit to complete the authentication of the startup password.
  • Page 26 "Preparing Documentation" section. Commissioning Cameras (SD Card Configured) 1. Log in to the Huawei camera WebUI. 2. For details about how to commission IP cameras and set parameters for them, see the documentation delivered with the equipment or obtain the documentation by referring to the...
  • Page 27 Setting Parameters on the VCN or IVS1800 WebUI 1. Logging In to the OMU Portal. 2. Initializing Hard Disks. 3. Modify the IP address for the VCN or IVS1800. 4. Enable camera NTP synchronization. Setting Parameters on the Client 1. Install the VCN IVS client in the VCN scenario. Install the iClient in the IVS1800 scenario.. 2.
  • Page 28 6. Setting EDCM Communication Parameters on the ECC800-Pro. 7. Connecting to the Network. FusionModule500 Smart Mini Data Center V100R021C00 User Manual For details, see the Huawei Technologies Co., Ltd. Huawei Industrial Base, Bantian, Longgang Shenzhen 518129 People's Republic of China www.huawei.com...
  • Page 29 WAN_1 AI/DI_2 AI/DI_1 WAN_1 ECC800-Pro(Front) AI/DI_1 ECC800-Pro(正面) AIDI_1 AIDI_2 COM1/AIDI_4 COM3/12V WAN1 LAN1/POE Cabinet MON1 AIDI_1 AIDI_2 COM1/AIDI_4 COM3/12V WAN1 LAN1/POE HUAWEI ground 机柜 WLAN HUAWEI point MON1 WLAN 接地点 RF_Z DO/12V AIDI_3 COM2/AIDI_5 COM4/CAN WAN2 LAN2/POE RF_Z DO/12V...