Huawei FusionPower6000 3.0 User Manual page 58

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 2-29 Combined cabinets (layout from right to left)
(A) 600 mm wide maintenance
bypass cabinet
(2) ECC800-Pro installation
positions
(5) Secondary circuit
components
(8) Output copper bars for
mechanical load
(11) Cable holes
Indicators and Buttons
Figure 2-30 Indicators and buttons
No.
1
2
Issue 03 (2023-02-08)
Item
On indicator
On button
Copyright © Huawei Digital Power Technologies Co., Ltd.
(B) 800 mm wide maintenance
bypass cabinet
(3) Maintenance bypass
switches for mechanical load
(6) Maintenance bypass
switches for IT load
(9) Output copper bars for IT
load
(12) Smart ETH gateways
Description
If the indicator is on, the corresponding switch
is turned on.
Used to turn on the corresponding switch.
2 Product Overview
(1) Centralized monitoring
modules
(4) SPD switches and SPDs
(7) PAD installation positions
(10) Input copper bars
51

Advertisement

Table of Contents
loading

Table of Contents