● For details about the requirements for installing horizontal copper bars
● Before installing horizontal copper bars in the compensation cabinet, route the
● Secure the vertical N bar of the cable inlet and bus tie cabinet or cable inlet
● To facilitate subsequent O&M, you are advised to use the central axis at the top
● Each time you install a copper bar, tighten the bolts on the copper bar and use
Issue 03 (2023-02-08)
Combination
Bus clip
NO TICE
between the transformer cabinet provided by the customer and the cable inlet
and bus tie cabinet, see the instructions provided by the manufacturer.
current transformers through the horizontal copper bars in sequence based on
the current transformer cable labels. Ensure that the side marked P1 faces the
cable inlet.
cabinet to the horizontal N bar only if a 3-pole cable inlet switch is used.
of a cabinet as a reference line. Tighten the screws on the copper bars near the
front door from front to back, and tighten the screws on the copper bars near
the rear door from back to front.
a torque wrench to check them based on the standard torque, and mark them.
Then install another copper bar.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
Copper Bar
Screw Details
No. and
Related Part
05
M16x70, 4
PCS
M12x65, 6
PCS
M12x55, 2
PCS
M8x35, 2 PCS
06
M12x65, 12
PCS
M12x55, 6
PCS
Current
Screw
transformer
delivered with
the
component
Transformer
Screw
bus clip
delivered with
the bus clip