Figure 5-4 Short-circuit terminals
Step 3 Prepare for testing the UPS.
1.
2.
3.
Step 4 Prepare for testing the maintenance bypass cabinet.
1.
2.
3.
4.
5.
6.
Issue 03 (2023-02-08)
Turn on the UPS mains input, bypass input, and output switches.
Pull out the UPS surge protection box, control module, intelligent detection
card, bypass module, and power module for about 150 mm and record them.
If the UPS is equipped with a top outlet kit, turn off the power switch of the
top outlet kit.
Turn on the maintenance bypass switch.
Disconnect all fuses and MCBs on the secondary circuit and record them.
Disconnect the SPD switch and record it. (If there is no SPD switch for the
surge protection module, remove the surge protection module and record it.)
Pull out the interface board and PSU of the centralized monitoring module for
about 150 mm and record them.
Pull out the main control module and PSU of the ECC800-Pro for about 150
mm, and record them.
Mark the corresponding port names on the power cable and voltage sampling
cable at the rear panel of the centralized monitoring module, remove the
cables, and record them.
Remove the cables from the panel of the branch monitoring module for the
maintenance bypass switch, and pull out the branch monitoring module.
Figure 5-5 Removing the cable and pulling out the branch monitoring
module
Copyright © Huawei Digital Power Technologies Co., Ltd.
5 Power-On Commissioning
158

Advertisement

Table of Contents
loading

Table of Contents