Huawei FusionPower6000 3.0 User Manual page 131

Table of Contents

Advertisement

FusionPower6000 3.0
User Manual (Not Against a Wall)
Figure 4-41 Installing the second layer of vertical copper bars for the maintenance
bypass and feeder cabinet for mechanical load
No.
a
b
c
d
Step 7 Install the second layer of horizontal copper bars and bus clips.
● If a PC partition panel between copper bars is configured, ensure that the PC
● When installing the second layer of copper bars, clamp the copper bars
Issue 03 (2023-02-08)
Combination
NO TICE
partition panel between the two layers of horizontal copper bars has been
installed before installing the second layer of horizontal copper bars.
upwards into the bus clip slot; otherwise, the bus clip may not be secured.
Copyright © Huawei Digital Power Technologies Co., Ltd.
4 Installation and Cable Connection
Copper Bar
Screw Details
No. and
Related Part
D-5
M8x35, 4 PCS
D-6
M8x35, 4 PCS
D-7
M8x35, 4 PCS
D-8
M6x30, 6 PCS
Securing
epoxy boards
124