Absolute Reference Time & Leap Second Management - Safran CORTEX Series User Manual

High data rate receiver
Table of Contents

Advertisement

4.5.3.3.4
Absolute Reference Time & Leap Second Management
The following scenario is a combination of the two previous scenarios.
Example:
 The absolute time reference is January 1
 The CORTEX is started on January 1
 The current leap second value is 10.
The procedure is as follows:
1. Enter:
Date of Next Offset 1 = 3600
Next Offset 1 = 31 536 010 (one non leap year + 10 seconds)
st
2. On January 1
, 1999 at 1 AM, (3600 seconds after boot up) check that the Current Offset is set
to 31 536 010 and that the time-tags are updated accordingly. The day counter is now equal to
366.
3. In the course of 1999, enter:
Date of Next Offset 1 = 0 (January 1
Next Offset 1 = 63 072 010 (two non-leap years + 10 seconds)
Next Offset 2 = Date of Next Offset 2 = 0
st
4. On January 1
, 2000 at 0 AM, check that the Current Offset is set to 63 072 010 and that the
time-tags are updated accordingly. The day counter is now equal to 731.
5. Repeat step 3 every following year.
© Safran Data Systems – IMP000074 e14r1
HIGH DATA RATE RECEIVER
HDR-4G+ USER'S MANUAL
st
, 1998 at 0 AM.
st
1999 at 0 AM with Current Offset = 0.
st
This document is the property of
It cannot be duplicated or distributed without expressed written consent.
Ref.
DTU 100782
Is.Rev
3.5
Date:
June 1, 2021
2000)
Safran Data Systems
.
Page 243

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents