Nortel Communication Server 100 Manual page 53

Carrier remote ipe fundamentals
Table of Contents

Advertisement

Quick reference to system installation and configuration 53
7.
At the remote site, install the Carrier Remote IPE column or
wall-mounted (or pedestal mounted) Carrier Remote IPE cabinet. Refer
to:
"Installing the Carrier Remote IPE column" (page 86)
or
"Installing the Carrier Remote IPE cabinet" (page 99)
8.
Configure the NT7R52 Remote Carrier Interface card. Refer to:
Figure 14 "Remote Carrier Interface card DIP-switch locations and
functions" (page 89)
"Installing system monitor cables" (page 94)
Note:
For the floor-standing Carrier Remote IPE column, select
the system monitor address on the Remote Carrier Interface
card and on the System Monitor card in the pedestal. The
system monitor address in both places must be the same and a
unique number from 0 to 31.
9.
Install the NT7R52 Remote Carrier Interface card into the Cont card
slot in the IPE Module or the Carrier Remote IPE cabinet. Also install
the power supply and the IPE cards.
10.
Install the internal cable assemblies. For the Carrier Remote IPE
column, refer to:
"Installing the backplane cable assemblies" (page 91)
Figure 28 "Remote Carrier IPE module connection diagram (single
RCI configuration)" (page 200)
Figure 15 "Backplane to I/O panel connections on the IPE module"
(page 94)
or, for the Carrier Remote IPE cabinet
"Installing the NT7R94AA Remote Cabinet Cable Assembly" (page
103)
Figure 29 "Remote Carrier IPE cabinet connection diagram (single
RCI configuration)" (page 201)
Figure 17 "Carrier cable routing for the Carrier Remote IPE cabinet"
(page 104)
11.
Install the external cables to the I/O panel. For the Carrier Remote IPE
column, refer to:
Nortel Communication Server 1000
Carrier Remote IPE Fundamentals
NN43021-555 04.01 4 June 2010
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.