Checking the MMI terminal operation
Connect anMMI terminal to the Local Carrier Interface card at the local site
and another MMI terminal at the Carrier Remote IPE site. To check the
MMI terminal operation, follow the steps in
MMI terminal operation" (page
Procedure 34
Checking the MMI terminal operation
Step
Action
1
Set the current mode of the MMI terminal to the MMI mode by
executing the L <address> command on the MMI terminal at
the local system site.
The Password is: M1LINK.
2
Check the status of the Local Carrier Interface card by executing
the D S [P] command.
3
Check the status of the Remote Carrier Interface card by
executing the D S D [P] command.
This command is sent over the carrier link to the Remote Carrier
Interface card for execution.
4
Check the log file content by executing the D L [P] command
to display log messages from the file starting with the oldest
message.
Examine the messages.
Checking carrier link protection switching
To verify that the carrier link protection switching is operating correctly,
conduct the following tests with carrier links:
forced carrier failure (disconnect carrier link at the I/O panel)
forced switchover
Note:
This test can be conducted only when carrier 2 is configured as
a spare carrier link.
If both carrier 0 and carrier 1 are faulty, carrier 0 will always have
sparring priority over carrier 1.
Forced carrier failure and switchover
To test forced carrier failure and switchover, follow the steps in
35 "Testing Forced carrier failure and switchover" (page
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
139).
Nortel Communication Server 1000
Carrier Remote IPE Fundamentals
NN43021-555 04.01 4 June 2010
Performing acceptance testing 139
Procedure 34 "Checking the
--End--
140).
Procedure

Advertisement

Table of Contents
loading

Table of Contents