Disconnect the call by hanging up the receiver on the telephone.
Removing the test setup
After acceptance testing has been completed and the results show that the
system is operating correctly, remove the setup used to conduct the testing
and restore equipment according to the customer configuration.
If the actual customer configuration was used to perform these tests, it is
not necessary to change or remove the setup.
Generating traffic reports
Use system traffic reports to identify calls made during acceptance testing
to and from the Carrier Remote IPE site.
The system traffic network loop report TFS001 provides statistics on the
number of timeslots used by each loop and the traffic over these loops as
measured in CCS (hundred call-seconds).
For more information on traffic reports, refer to the Traffic control program
LD 02 in Software Input Output Administration (NN43001-611) ().
Copyright © 2007-2010 Nortel Networks. All Rights Reserved.
Nortel Communication Server 1000
Carrier Remote IPE Fundamentals
NN43021-555 04.01 4 June 2010
Performing acceptance testing 141
--End--

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Communication Server 100 and is the answer not in the manual?

Table of Contents