414-03A-92
GENERAL PROCEDURES (Continued)
High Voltage/Traction Battery
53. Disconnect the Traction Battery Low-Voltage
Service Cord from the 76-pin low-voltage
connector on the vehicle.
54. Apply Locktite 242 (threadlock and sealer) to
the 22 traction battery cover bolts.
55. Install the traction battery cover.
•
56. Remove the Traction Battery High-Voltage
Lockout and Diagnostic Tool.
57. Install the traction battery. Refer to
Battery.
Install the 22 bolts.
2001 Ranger EV, 01/2001
414-03A-92
Traction