414-03A-160
DISASSEMBLY AND ASSEMBLY (Continued)
High Voltage/Traction Battery
8. NOTE: The battery module numbers
correspond to the numbers on the heating
blanket.
NOTE: The battery modules must be installed
with the terminals oriented as illustrated.
Install the 27 lower-level battery modules.
•
NOTE: The high-voltage jumper (HVJ) retaining
nuts are hand-tightened during initial installation.
9. HVJ installation notes:
1 Position the HVJ cable ends parallel to the
2 Route the sense lead wiring under the main
Label the battery modules as illustrated.
side of the battery module.
HVJ cable.
2001 Ranger EV, 01/2001
414-03A-160