Ford Electric Ranger 2001 Manual page 527

Hide thumbs Also See for Electric Ranger 2001:
Table of Contents

Advertisement

414-03A-124
REMOVAL AND INSTALLATION (Continued)
High Voltage/Traction Battery
2. Position the lift table and battery pack under the
vehicle.
3. With the assistance of a second person,
carefully lower the vehicle down to within ten
inches of the battery pack.
4.
battery pack are aligned during battery pack
installation.
Lift the battery pack up into the mounting
position.
5. NOTE: The LH front bolt must be installed
first in order to properly align the battery pack.
Install the battery pack mounting bolts.
6. Lower the lift table and disconnect the shop air
source.
7. Raise the vehicle and roll the lift table from
under the vehicle.
Connect the lift table to the shop air supply.
CAUTION: Make sure the vehicle and
Apply Locktite 242 to the bolts prior to
installation.
Install the LH front bolt first in order to
properly locate the battery pack.
2001 Ranger EV, 01/2001
414-03A-124

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents