Reviewing The Lamination Module Boot-Up Sequence; Reviewing The Lamination Module Sequence Of Operations - HID HDP5000 User Manual

High definition card printer/encoder
Hide thumbs Also See for HDP5000:
Table of Contents

Advertisement

All rights reserved

Reviewing the Lamination Module Boot-up Sequence

Step
Process
1
The Lam Headlift turns until the head up position is returned from Headlift
Sensor.
2
The Lamination Ribbon Motor activates. (Note: The RFID determine the
presence of a roll of lamination.)
3
The Card Sensor checks for the presence of a card and ejects it if found.

Reviewing the Lamination Module Sequence of Operations

The LAM sequence of operations begins after printing has occurred with the Card Printer.
Step Process
1
The card is fed onto the Lamination Module.
2
The card is fed to the Card Position Sensor.
3
The Lamination Take-up Motor begins cycling until the Lamination Sensor
detects the mark.
4
The Card Feed Motor activates to place the leading edge of the card on the Lam
Roller.
5
The Lam Roller Lift Motor cycles until the Transfer Roller Lift Sensor detects the
roller is down.
6
The Card Feed Motor and the Lamination Drive Motor activate for the length of
the card.
7
The Lam Roller Lift Motor cycles until the Lam Roller Lift Sensor detects the
roller is up.
HDP5000 High Definition Card Printer/Encoder User Guide
HID Global Corporation
L000950 Rev 1.8
14

Advertisement

Table of Contents
loading

Table of Contents