AMF settings

FwRet break
Delay between GCB opening and MCB closing during the return to mains when reverse synchronizing is not
enabled.
Delay between MCB opening and GCB closing in TEST Mode, when Return To mains = ENABLED and
power cut comes.
Step:
0,1 s
0 – 60,0 s
Range:
Force value possibility: Yes
Mains ret del
Delay after the mains return to the start of synchronizing of MCB (SPtM) or GCB (SPI).
Step:
1 s
0 – 3600 s
Range:
Force value possibility: Yes
Inteli NT GeCon-MARINE SPI, SW Version 3.2, ©ComAp – July 2015
IGS-NT-GeCon-MARINE-SPI-3.2.PDF
[ s ] (FV)
[ s ] (FV)
92

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IG-NT GC and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Is-ntc-bbIg-ntc gcIs-ntIg-nt-bbIg-ntc-bb

Table of Contents