Shed delay
Time delay for both current and frequency LD shed level limit.
Step:
0,1 s
0,0 – 600,0 s
Range:
Force value possibility: Yes
Recon delay
The amount of time that the current/frequency has to be under/above recon level before the next part of the
load is reconnected.
Step:
1 s
Range:
0 - 600 s
Force value:
Yes
AutoLd recon
Switch between manual and automatic reconnection of shedded load.
DISABLED
Rising edge on this input resets controller to the lower stage, but only if the load is under the
Ld recon level. Ld recon delay is not important in this case.
ENABLED
Load reconnection is automatic and depends on setpoints Ld recon level and Ld recon
delay. Binary input MAN load recon has no function.
Hint:
Load shadding contains 10 levels for connect/disconnect of Loads. Now only configured Load shedding
levels are used in system. In case of configure Load shedding levels 2,3,4 – system will operate with Load
shedding levels 1,2,3 and 4 only. Important is the highest number of configured level of Load shedding.
Inteli NT GeCon-MARINE SPI, SW Version 3.2, ©ComAp – July 2015
IGS-NT-GeCon-MARINE-SPI-3.2.PDF
[ s ] (FV)
[ s ] (FV)
[ DISABLED / ENABLED ]
(FV)
102
Need help?
Do you have a question about the IG-NT GC and is the answer not in the manual?