ComAp IG-NT GC Reference Manual page 10

Inteli new technology modular generator controller multiple internal engines application – sw configuration spi
Hide thumbs Also See for IG-NT GC:
Table of Contents

Advertisement

BI: ReadyToLoad – signal from Engine unit – it means that Engine is ready (speed is ok, no 2
alarms) and can be loaded.
Other signals:
-
Information about Warnings / SD in one unit can be sent to second unit.
ECU – in case of Ecu communicating via CAN bus J1939 – GeCon can be connected to CAN1 for
-
showing ECU values on the display
-
Interconnection on CAN2:
o
For Time and Date synchronisation only- in case of IGS-NT and ID-DCU
o
In case of connection IB-NT or I-LB+ - you can monitor both kind of units (IGS-NT, ID-DCU)
In case of connection display – you can switch between both kind of units (IGS-NT, ID-DCU)
o
Inteli NT GeCon-MARINE SPI, SW Version 3.2, ©ComAp – July 2015
IGS-NT-GeCon-MARINE-SPI-3.2.PDF
nd
level
10

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the IG-NT GC and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Is-ntc-bbIg-ntc gcIs-ntIg-nt-bbIg-ntc-bb

Table of Contents