Priming the System and Performing the 'Installation Check'
The steps described below are performed using the Instrument Utility / Lab
Advisor software.
1 Connect all channels with HPLC grade water and use the Purge Pump for
2 Prime all connected channels sufficiently until all channels are bubble free.
3 Use the Instrument Control functionality to prime your system with HPLC
4 Perform the Installation Check from the Service and Diagnostics menu and
5 Create and print out a Status Report.
1220 Infinity II LC System User Manual
Priming the System and Performing the 'Installation Check'
flushing the solvent channels.
Software Revision B.01.04 and below:
•
Tools > Pump > Purge Pump
Software Revision B.02.01 and higher:
•
Service & Diagnostics > Pump (Tools must be checked) > Purge Pump
grade water to remove air out of the system.
Apply the following conditions:
•
Purge Valve: closed
•
Flow: 2 mL/min
•
Time: 5 min/channel
•
Set stroke: 100 μL
print out the test result.