Specifications Installation Cautions and Warnings Unpacking the Module Installing the Handle Plate to the 1220 Infinity II LC Instrument Installing the Solvent Selection Valve Support Installing the Mobile Solvent Compartment Installing the Column Wire Mesh Installing the Attenuation Unit to the Bench...
Application Examples Introduction The Agilent 1220 Infinity II Mobile LC Solution is an Agilent 1220 Infinity II LC with integrated variable wavelength or diode array detector and a mobile upgrade kit that enables transportation. The 1220 Infinity II LC Mobile Upgrade Kit consists of functional parts that allows the Agilent 1220 Infinity II LC to be mounted into a mobile lab so it can be moved to different locations to access remote measurement sites.
For a comfortable handling of the solvent bottles additionally 20 cm (7.9 in) should be kept free above the bottles. Figure 2 on page 3 for more details. Figure 2 Required space for a 1220 Infinity II LC Instrument installed to a mobile upgrade kit (numbers given in mm)
Page 4
Site Requirements and Specifications Site Requirements Bench Material and Strength A proper bench must be chosen under the aspect that it must bear the combined weight of the instrument with solvent bottles and the mobile kit. The bench material must be suitable for a proper fastening solution. Fastening Solution Because of the expected varieties in bench material and strength the fastening material is not included in the kit.
Page 5
Site Requirements and Specifications Site Requirements Figure 3 Dimensions of the attenuation unit...
Site Requirements and Specifications Specifications Specifications Physical Specifications Table 1 Physical Specifications Type Specification Comments Weight (all parts) 14.2 kg (31.3 lbs) Dimensions of the attenuation 73 x 480 x 445 mm “Installing the Attenuation unit (2.9 x 18.9 x 17.5 in) Unit to the Bench”...
N O T E facilities to comply with local safety regulations (e.g. special solvent waste and storage containers). Please verify that these regulations are met before you operate the 1220 Infinity II LC in your mobile lab. Unpacking the Module...
Page 8
Delivery Checklist Ensure all parts and materials have been delivered with the mobile upgrade kit. The delivery checklist is shown below. Please report missing or damaged parts to your local Agilent Technologies sales and service office. Description G4292-60001 Mobile solvent compartment Includes 4 prefixed bottle holders and 4 Leak Tub brackets to fix it to the module’s solvent compartment...
Page 9
Installation Unpacking the Module Leak tub brackets Mobile solvent compartment SSV support Handling plate Attenuation unit Figure 4 Mobile Kit Overview...
➔ Lift the instrument with at least two persons. 1 Lay the 1220 Infinity II LC Module carefully on its rear plate. For the G4290B it is necessary either to position the bottom of the instrument slightly free over the N O T E bench’s edge or to lay it onto the carton box of the solvent compartment.
Page 11
Installation Installing the Handle Plate to the 1220 Infinity II LC Instrument 4 Verify that the screws are fixed and carefully bring the instrument back into the upright position.
Installation Installing the Solvent Selection Valve Support Installing the Solvent Selection Valve Support When The Solvent Selection Valve Support needs to be installed if a solvent selection valve (SSV) is used with the instrument. Parts required Description G4292-00001 SSV support (delivered as part of the G4292-60000 attenuation unit) Preparations If SSV is already installed:...
Installation Installing the Mobile Solvent Compartment Installing the Mobile Solvent Compartment Parts required Description G4292-60001 Mobile solvent compartment including 4 special brackets Sharp metal edges WA R N I N G Sharp-edged parts of the equipment may cause injuries. ➔ To prevent personal injury, be careful when getting in contact with sharp metal areas.
Page 14
Installation Installing the Mobile Solvent Compartment 3 Take the mobile solvent compartment and push it into the solvent container. The two metal clips will grip into the solvent container's plastic. On the rear of the mobile solvent compartment is the grounding clamp which needs to hook into the metal sheet between the board extension and the main assembly.
The bench holding the instrument requires 4 screws or bolts to secure the attenuation unit of the 1220 Infinity II Mobile LC Kit to the bench. This fastening material is not provided from Agilent because of the unpredictable situation of bench material and dimension.
Page 16
Installation Installing the Attenuation Unit to the Bench 1 Identify the final position of the instrument on the bench according to the specifications given below. 2 Drill the 4 holes in the bench. Either use the attenuation unit as a model or prepare the holes according to the figure below.
When Whenever the instrument is installed onto the attenuation unit in the mobile lab. Preparations Install the handle plate to the 1220 Infinity II LC Instrument (see “Installing the Handle Plate to the 1220 Infinity II LC Instrument” on page 10).
Page 18
Installation Securing the LC to the attenuation unit 3 Secure the front retaining brackets by pressing the arrester button. The two front retaining brackets must always get closed and secured by pressing the arrestor N O T E button. They will not secure the instrument if not properly closed.
N O T E facilities to comply with local safety regulations (e.g. special solvent waste and storage containers). Please verify that these regulations are met before you operate the 1220 Infinity II LC in your mobile lab. Preparing transit and relocation...