13
Fix the heat exchanger to the clamp unit and the flow
cell body to the heat exchanger.
15
Check for a centered holder vs. hole. If required adjust
with the holder screws.
1220 Infinity II LC System User Manual
Diode Array Detector (DAD)
14
Fix the inlet capillary to the flow cell body handtight first.
Then do a 1/4 turn with a 4-mm wrench.
Next Steps:
16
Reconnect the capillaries, see
Flow Cell"
on page 307.
17
Perform a leak test.
18
Insert the flow cell.
19
Replace the front cover.
20
Perform a
"Wavelength Verification and
Recalibration"
on page 188 or a
Test"
on page 180 to check the correct positioning of the
flow cell.
Maintenance and Repair
"Remove and Install a
"Holmium Oxide
11
317