Setting The Assert Control Parameters; Establishing The Configuration Task; Setting The Period For Keeping The Assert State - Huawei Quidway S9300 Configuration Manual - Multicast

Terabit routing switch
Hide thumbs Also See for Quidway S9300:
Table of Contents

Advertisement

3 PIM-DM Configuration
Graft
Graft-Ack
Hello
Join-prune
State-Refresh
BSR

3.10 Setting the Assert Control Parameters

This section describes how to set control parameters of the PIM-DM Assert messages.

3.10.1 Establishing the Configuration Task

3.10.2 Setting the Period for Keeping the Assert State

3.10.3 Checking the Configuration
3.10.1 Establishing the Configuration Task
Applicable Environment
When an S9300 that runs PIM-DM receives multicast data through the downstream interface,
the S9300 learns that other upstream S9300s exist on this network segment. The S9300 sends
an Assert message through the downstream interface to take part in the election of the unique
upstream device.
S9300s configured with default values can work normally. You can change the values of relevant
parameters according to the specific network environment. If there is no special requirement,
default values are recommended.
Pre-configuration Tasks
Before setting the Assert control parameters, complete the following tasks:
l
l
Data Preparation
To set the Assert control parameters, you need the following data.
No.
1
3.10.2 Setting the Period for Keeping the Assert State
3-24
0
0
0
0
0
0
Configuring the unicast routing protocol to ensure that IP routes between nodes are
reachable
3.4 Configuring Basic PIM-DM Functions
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd.
Quidway S9300 Terabit Routing Switch
0
0
0
0
84
0
0
0
0
0
0
0
on the shortcut menu.
Data
Period for keeping the Assert state
Configuration Guide - Multicast
Issue 01 (2009-07-28)

Advertisement

Table of Contents
loading

Table of Contents