Connection Diagram - Mitsubishi Electric GOT2000 Series Connection Manual

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

11.3 Connection Diagram

The following diagram shows the connection between the GOT and the PLC.
11.3.1
RS-232 cable
■1. Connection diagram
(1) RS232 connection diagram 1)
*1
Terminal number of the controller and the converter differ depending on the model.Refer to the following table.
*2
For KP2000 series, the terminal No. differs according to the model.
*3
This indicates the symbols of the position 10) (third zone) of the following models.
Model: KP2 4) 5) 6) 7) 8) 9) 10) – 12) 13) 14)
For the symbol B, two terminal numbers are available. Select as necessary.
■2. Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
1.4.1 GOT connector specifications
(3) CHINO controller side connector
Use the connector compatible with the CHINO controller side module.
For details, refer to the user's manual of the CHINO controller.
GOT side
CD
1
RD(RXD)
2
SD(TXD)
3
ER(DTR)
4
SG
5
DR(DSR)
6
RS(RTS)
7
CS(CTS)
8
-
9
FG
-
Signal
LT300
LT400
name
Terminal No.
Terminal No.
SD
11
11
RD
13
13
SG
15
15
KP1000
Signal
name
Terminal No.
SD
13
RD
12
SG
14
CHINO controller
side, Interface
converter
-
SD
RD
-
SG
Controller
DZ1000,
DB1000
DZ2000
Terminal No.
Terminal No.
19
13
21
12
23
14
Controller
KP2000
*2
Terminal No.
*3
*3
*3
*3
*3
R
, B
, C
, D
B
, E
27
30
26
29
28
31
11.3 Connection Diagram
Converter
DB2000
SC8-10
Terminal No.
Terminal No.
27
2
26
1
28
3
AL3000
SE3000
AH3000
Terminal name
Terminal name
*3
SD
SD
RD
RD
SG
SG
11 - 11
11

Advertisement

Table of Contents
loading

Table of Contents