Mitsubishi Electric GOT2000 Series Connection Manual page 420

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

10.3 Connection Diagram
The following diagram shows the connection between the GOT and the PLC.
10.3.1
RS-232 cable
■1. Connection diagram
(1) RS-232 connection diagram 1)
*1
■2. Precautions when preparing a cable
(1) Cable length
The length of the RS-232 cable must be 15m or less.
(2) GOT side connector
For the GOT side connector, refer to the following.
(3) Shinko Technos indicating controller side connector
Use the connector compatible with the Shinko Technos indicating controller side.
For details, refer to the user's manual of the Shinko Technos indicating controller.
10 - 8
10.3 Connection Diagram
GOT side
CD
1
RD(RXD)
2
SD(TXD)
3
ER(DTR)
4
SG
5
DR(DSR)
6
RS(RTS)
7
CS(CTS)
8
NC
9
FG
-
Connect FG grounding to the appropriate part of a cable shield line.
1.4.1 GOT connector specifications
Indicating
controller side
COM
TX
RX
*1

Advertisement

Table of Contents
loading

Table of Contents