Mitsubishi Electric GOT2000 Series Connection Manual page 316

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■3. RS-485 cable
(1) Connection diagram
(a)
RS-485 connection diagram 1)
(b)
RS-485 connection diagram 2)
*1
(2) Precautions when preparing a cable
(a)
Cable length
The length of the RS-485 cable must be 500m or less
(b)
GOT side connector
For the GOT side connector, refer to the following.
(c)
KEYENCE PLC side connector
Use the connector compatible with the KEYENCE PLC side module.
For details, refer to the KEYENCE PLC user's manual.
6 - 20
6.2 Serial Connection
GOT side
SDA
1
RDA
2
RSA
3
CSA
4
SG
5
SDB
6
RDB
7
RSB
8
CSB
9
FG
GOT side
(terminal block)
SDA
SDB
RDA
RDB
SG
* 1
RSA
* 1
RSB
* 1
CSA
* 1
CSB
The signals RSA, RSB, CSA, and CSB are not provided for
1.4.1 GOT connector specifications
KEYENCE PLC side
(terminal block)
RDB(+)
4
SDB(+)
5
SG
1
RDA(-)
2
SDA(-)
3
KEYENCE PLC side
(terminal block)
RDB(+)
4
RDA(-)
2
SDB(+)
5
SDA(-)
3
SG
1
.Return connection is not required.

Advertisement

Table of Contents
loading

Table of Contents