Mitsubishi Electric GOT2000 Series Connection Manual page 67

Graphic operation terminal
Hide thumbs Also See for GOT2000 Series:
Table of Contents

Advertisement

■2. Perform an I/O check
Whether the PLC can communicate with the GOT or not can be checked by the I/O check function.
If this check ends successfully, it means correct communication interface settings and proper cable connection.
Display the I/O check screen by Main Menu.
• Display the I/O check screen by [Main menu]
For details on the I/O check, refer to the following manual:
GOT2000 Series User's Manual (Utility)
Step 1.
Touch [CPU] on the I/O check screen.
Touching [CPU] executes the communication check with the connected PLC.
Step 2.
When the communication screen ends successfully, the screen on the left is displayed.
[Self check]
[I/O check].
1.
1.6 Checking for Normal Monitoring
1
1 - 39

Advertisement

Table of Contents
loading

Table of Contents