1. PREPARATORY PROCEDURES FOR MONITORING
The following shows the procedures to be taken before monitoring and corresponding reference sections.
Step 1.
Setting the communication interface
Determine the connection type and channel No. to be used, and perform the communication setting.
Step 2.
Writing the package data
Write the project data, system application onto the GOT.
Step 3.
Verifying the package data
Verify the project data, system application are properly written onto the GOT.
Step 4.
Attaching the communication unit and connecting the cable
Mount the optional equipment and prepare/connect the connection cable according to the connection type.
Step 5.
Verifying GOT recognizes connected equipment
Verify the GOT recognizes controllers on [Communication Settings] of the Utility.
Step 6.
Verifying the GOT is monitoring normally
Verify the GOT is monitoring normally using Utility, Developer, etc.
1 - 2
1.1Setting the Communication Interface
Each chapter GOT Side Settings
1.2.1Writing the project data and OS onto the GOT
1.2.2Checking the project data and OS writing on GOT
1.3Option Devices for the Respective Connection
1.4Connection Cables for the Respective Connection
Each chapter System Configuration
Each chapter Connection Diagram
1.5Verifying GOT Recognizes Connected Equipment
1.6Checking for Normal Monitoring