EM–30
EM
RH side :
No. 1
2GR-FE ENGINE MECHANICAL – ENGINE ASSEMBLY
59. REMOVE VANE PUMP ASSEMBLY
A129634
A
B
A138331E01
60. INSTALL ENGINE HANGERS
LH side :
No. 2
A129635E03
61. REMOVE FRONT FRAME ASSEMBLY
A132990
(b) Remove the 4 bolts, 2 nuts, and frame side rail
plates RH and LH.
(c) Remove the 4 bolts, 2 nuts, and front suspension
member brace rear RH and LH.
(d) Operate the engine lifter, then remove the engine
assembly from the vehicle.
NOTICE:
Make sure that the engine is clear of all wiring
and hoses.
(a) Disconnect the power steering oil pressure switch
connector.
(b) Remove the pressure feed tube clamp bolt.
(c) Loosen the bolt A.
(d) Remove the bolt B and vane pump.
(a) Install the 2 engine hangers with the 4 bolts as
shown in the illustration.
Part No.:
No. 1 Engine hanger 12281-31070
No. 2 Engine hanger 12282-31050
Bolts 91671-10825
Torque: 33 N*m (337 kgf*cm, 24 ft.*lbf)
(b) Attach the engine sling device and hang the engine
with the chain block.
(a) Disconnect the connector and clamp.