Toyota 2GR-FE Manual page 835

Table of Contents

Advertisement

LU–18
Apply seal packing as follows
Area
Continuous Line Area
Alternate Long and short Dashed Line
Area
Dashed Line Area
Diagonal Line Area
Drive Rotor
Spline
LU
C
C
B
C
B
B
C
Nut
2GR-FE LUBRICATION – OIL PUMP
A128017E01
Crank-
shaft
A132229E02
C
A
C
C
C
C
B
B
B
B
B
B
Nut
NOTICE:
• When the contact surfaces are wet, wipe them
with oil-free cloth before applying seal
packing.
• Install the chain cover within 3 minutes and
tighten the bolts within 15 minutes after
applying seal packing.
• Do not start the engine for at least 2 hours
after installing.
Seal Packing Diameter
4.5 mm or more (0.177 in.)
3.5 mm or more (0.138 in.)
3.5 mm or more (0.138 in.)
6.0 mm or more (0.236 in.)
(c) Install a new gasket.
(d) Align the oil pump's drive rotor spline and the
crankshaft as shown in the illustration. Install the
spline and chain cover to the crankshaft.
(e) Temporarily tighten the timing chain cover with the
23 bolts and 2 nuts.
Area 4
B
C
B
Area 1
B
Area 3
Application Position from Inside Seal Line
3.0 to 4.0 mm (0.118 to 0.158 in.)
2.0 to 3.0 mm (0.079 to 0.118 in.)
3.0 to 4.0 mm (0.118 to 0.158 in.)
5.0 mm (0.197 in.)
Area 4
Area 2
Area 4
Area 1
Area 3
A128019E02

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents