Install Front Frame Assembly - Toyota 2GR-FE Manual

Table of Contents

Advertisement

(h)
(i)
(g)
(i)
RH Side:
LH Side:
2GR-FE ENGINE MECHANICAL – ENGINE ASSEMBLY
(e) Install the vacuum hose clamp with the bolt.
(f)
A129466
(g) Install the clamp and connect the throttle with motor
(h) Connect the vapor feed hose.
(i)
(g)
22. REMOVE ENGINE STAND
23. INSTALL DRIVE PLATE AND RING GEAR SUB-
ASSEMBLY (See page EM-13)
A129464E04
24. INSTALL AUTOMATIC TRANSAXLE ASSEMBLY
HINT:
See page AX-214.
25. INSTALL STARTER ASSEMBLY (See page ST-148)
26. INSTALL ENGINE WIRE
27. INSTALL FRONT DRIVE SHAFT ASSEMBLY LH (See
page DS-20)
28. INSTALL FRONT DRIVE SHAFT ASSEMBLY RH (See
page DS-21)

29. INSTALL FRONT FRAME ASSEMBLY

(a) Install the engine mounting insulators RH and LH
A078403E06
(b) Install the engine mounting insulator FR with the
A132988
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
Connect the No. 1 ventilation hose.
body assembly connector.
Connect the 2 water by-pass hoses to the throttle
with motor body assembly.
with the 2 nuts.
Torque: 95 N*m (969 kgf*cm, 70 ft.*lbf)
bolt.
Torque: 87 N*m (887 kgf*cm, 64 ft.*lbf)
EM–43
EM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents