Toyota 2GR-FE Manual page 104

Table of Contents

Advertisement

Plastigage
No. 1 Journal
Other Journals
Plastigage
2GR-FE ENGINE MECHANICAL – ENGINE UNIT
(l)
No. 1 journal
Other journals
No. 1 journal
Other journals
Other Journals
29. INSPECT CONNECTING ROD THRUST CLEARANCE
(a) Install the connecting rod cap (See page EM-113).
A129758E03
(b) Using a dial indicator, measure the thrust clearance
A120723
30. INSPECT CONNECTING ROD OIL CLEARANCE
(a) Clean the crank pin and bearing.
(b) Check the crank pin and bearing for pitting and
(c) Lay a strip of Plastigage on the crank pin.
A131814E01
Measure the Plastigage at its widest point.
Standard oil clearance
Item
0.040 to 0.079 mm (0.0016 to 0.0031 in.)
0.025 to 0.062 mm (0.00098 to 0.0024 in.)
Maximum oil clearance
Item
If the oil clearance is greater than the maximum,
replace the camshaft. If necessary, replace the
camshaft housing.
while moving the connecting rod back and forth.
Standard thrust clearance:
0.15 to 0.40 mm (0.0059 to 0.0157 in.)
Maximum thrust clearance:
0.50 mm (0.020 in.)
If the thrust clearance is greater than the maximum,
replace the connecting rod assemblies as
necessary. If necessary, replace the crankshaft.
scratches.
EM–103
Oil Clearance
Oil Clearance
0.10 mm (0.0039 in.)
0.09 mm (0.0035 in.)
EM

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents