Toyota 2GR-FE Manual page 673

Table of Contents

Advertisement

ES–506
ES
(*3)
2GR-FE ENGINE CONTROL SYSTEM – THROTTLE BODY
A135709
A135708
2.
3.
A135707
4.
A135706
(*1)
(*2)
A135705E01
(b) Install the throttle body with the 4 bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
(c) Connect the 2 water by-pass hoses.
(d) Connect the throttle body connector and clamp.
INSTALL NO. 1 AIR CLEANER INLET (See page
49)
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See
page EM-50)
INSTALL AIR CLEANER CAP SUB-ASSEMBLY
(a) Install the air cleaner cap sub-assembly, and
connect the 3 bands.
(b) Connect the mass air flow meter connector (
(c) Connect the No. 2 ventilation hose (
(d) Connect the hose band (
EM-
*
1).
*
2).
*
3).

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents