Toyota 2GR-FE Manual page 650

Table of Contents

Advertisement

2GR-FE ENGINE CONTROL SYSTEM – CAMSHAFT TIMING OIL CONTROL VALVE
ES–486
ES
ASSEMBLY
(b) Install the camshaft timing oil control valve with the
bolt.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
NOTICE:
Make sure that the O-ring is not cracked or
jammed when installing the oil control valve.
(c) Connect the camshaft timing oil control valve
connector.
5.
INSTALL INTAKE AIR SURGE TANK (See page
A135698
18)
6.
INSTALL NO. 1 AIR CLEANER INLET (See page
49)
7.
INSTALL AIR CLEANER CASE SUB-ASSEMBLY (See
page EM-50)
8.
INSTALL AIR CLEANER CAP SUB-ASSEMBLY (See
page ES-506)
9.
INSTALL AIR CLEANER INLET ASSEMBLY (See page
EM-50)
10. INSTALL V-BANK COVER SUB-ASSEMBLY (See
page EM-52)
11. INSTALL COOL AIR INTAKE DUCT SEAL (See page
EM-52)
12. INSTALL COWL TOP PANEL OUTER SUB-
ASSEMBLY
(a) Install the cowl top panel outer sub-assembly with
the 4 bolts and 4 nuts.
Torque: Bolt
13. INSTALL WINDSHIELD WIPER MOTOR AND LINK
A136272
(See page WW-14)
14. INSTALL COWL TOP VENTILATOR LOUVER SUB-
ASSEMBLY (See page WW-15)
15. INSTALL FRONT FENDER TO COWL SIDE SEAL RH
(See page WW-15)
16. INSTALL FRONT FENDER TO COWL SIDE SEAL LH
(See page WW-15)
17. INSTALL WINDSHIELD WIPER ARM AND BLADE
ASSEMBLY LH (See page WW-15)
18. INSTALL WINDSHIELD WIPER ARM AND BLADE
ASSEMBLY RH (See page WW-16)
19. ADD ENGINE COOLANT (See page CO-6)
20. CHECK FOR ENGINE COOLANT LEAKS (See page
CO-1)
21. INSTALL ENGINE UNDER COVER RH
5.0 N*m (51 kgf*cm, 44 in.*lbf)
Nut
85 N*m (867 kgf*cm, 63 ft.*lbf)
FU-
EM-

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents