Daewoo CIELO EURO III Manual page 141

Table of Contents

Advertisement

1E – 13 ENGINE ELECTRICAL
5. Connect the harness connector to the back of the
generator.
6. Install the generator lead to the battery and fasten
the lead with the nut.
Tighten
Tighten the generator battery lead nut to 15 NSm
(11 lb-ft).
7. Lubricate the injector O-rings on the DOHC engine
with engine oil.
8. Install the fuel rail assembly.
Tighten
Tighten the fuel rail retaining bolts to 20 NSm (15 lb-
ft).
9. Install the throttle body. Refer to Section 1F, Engine
Controls.
A102E232
10. Install the harness retaining clamp bolt.
A202E004
11. Install the air intake tube and the connector.
A202E002
DAEWOO T-154 BL2,3

Advertisement

Table of Contents
loading

Table of Contents