Copying And Verifying Parameters On The Operation Panel; Parameter Copy; Reading The Parameter Settings Of The Inverter To The Operation Panel - Mitsubishi Electric FR-F800 Instruction Manual

Hide thumbs Also See for FR-F800:
Table of Contents

Advertisement

5.15
Copying and verifying parameters on the
operation panel
Pr.CPY setting value
0.---
1.RD
2.WR
3.VFY
NOTE
• When the destination inverter is other than the FR-F800 series or when parameter copy is attempted after the parameter
copy reading was stopped, "model error (
• Refer to the parameter list on
• When the power is turned OFF or an operation panel is disconnected, etc. during parameter copy writing, write again or
check the setting values by parameter verification.
• When parameters are copied from a different-capacity inverter, there are parameters with different initial values depending on
the inverter capacity, so the setting values of some parameters will be automatically changed. After performing a parameter
copy from a different-capacity inverter, check all the parameter settings. (Refer to the parameter list
parameters with different initial values depending on individual inverter capacity.)
• If parameters are copied from an older inverter to a newer inverter that has additional parameters, out-of-range setting values
may be written in some parameters. In that case, those parameters operate as if they were set to their initial values.
5.15.1

Parameter copy

• Inverter parameter settings can be copied to other inverters.
Reading the parameter settings of the inverter to the operation panel
Connect the operation panel to the source inverter.
1.
Parameter setting mode
2.
Press
to choose the parameter setting mode. (The parameter number read previously appears.)
Selecting the parameter number
3.
Turn
to
"
" appears.
Reading to operation panel
4.
Turn
to change the set value to "
panel. (It takes about 30 seconds to read all the settings. During reading, "
End reading
5.
"
" and "
NOTE
appears... Why?
- Parameter read error. Perform the operation from step 3 again.

Copying and verifying parameters on the operation panel

Initial display
Copy the source parameters to the operation panel.
Write the parameters copied to the operation panel to the destination inverter.
Verify parameters in the inverter and operation panel. (Refer to
page 597
for the availability of parameter copy.
Operation
(parameter copy), and press
". Press
" flicker alternately after settings are read.
Description
page
)" appears.
.
to start reading of the inverter parameter settings by the operation
" flickers.)
523.)
(page
112) for details of
PARAMETERS
5
521

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents