Barco DP2K-12C Service Manual page 313

Hide thumbs Also See for DP2K-12C:
Table of Contents

Advertisement

Image 19-8
4. Connect the power cables coming from the Start Pulse Generator with the "LAMP OUT" sockets of the LPS module as illustrated.
Fasten the nuts with a torque of 4Nm (2.95 lbf*ft).
Warning:
Make sure to place the washers and cable eyes in correct order upon the pin as illustrated. Always use a plain
washer between the output pin and the cable eyes.
Image 19-9
Lamp out connection
P
LPS output pin.
W
Plain washer.
L
Lock washer.
E1
Cable eye from SPG module.
E2
Cable eye from LPS unit.
N
Nut.
Warning:
Respect the polarity of the socket and cables. Red marked cables with the "+" pin, black marked cables with the "-"
pin.
-
Image 19-10
Warning:
Make sure that both SPG cables are provided with ferrite blocks (C). Reuse the ferrite blocks of the removed SPG
module in case no ferrite blocks are present upon the installed SPG module.
R5905043 DP2K-12C/11CX 19/02/2018
W
E1
+
P
19. Start Pulse Generator
E2
W
L
N
309

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Dp2k-11cx

Table of Contents