Chapter 5 Installing The Displays And Performing Final Leveling Of The Main Display Structure; Required Display Preinstallation Check; Assembly Note For Systems That Use A Free-Standing Light Reflector Wall; Installing The Displays - Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual

Table of Contents

Advertisement

Installing the Displays and Performing Final
Leveling of the Main Display Structure
Revised: May 20, 2015, OL-27038-01
This chapter describes the steps you perform to install the displays and includes the following sections:

Required Display Preinstallation Check

Before you install the displays, check their functionality by performing the tasks that are described in
the
do so might result in installing a display that is not functional.
Assembly Note for Systems That Use a Free-Standing Light
Reflector Wall
If your system uses a free-standing light reflector, partially build the wall by completing
Step 7
displays. If you need to reposition the display structure, it is easier to do so before installing the displays.

Installing the Displays

To install the displays, complete the following steps.
OL-27038-01
Assembly Note for Systems That Use a Free-Standing Light Reflector Wall, page 5-1
Installing the Displays, page 5-1
"Checking the Function of the 65-Inch Display Prior to Installation" section on page
in
Chapter 6, "Installing the Free-Standing Reflector Wall Structure"
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
5
C H A P T E R
before installing the
1-3. Failure to
Step 1
through
5-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents