Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 84

Table of Contents

Advertisement

Installing Seismic Brackets (Optional), Part Number CTS-TX9K-SEISMIC=
b.
Key Description
1
Figure 4-18
Rear Seismic Bracket Location on Rear Leveling Foot
c.
d.
e.
f.
g.
h.
i.
j.
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4-20
Press the bracket slot into the space between the two M10 locking nuts on the leveling foot, as shown
in
Figure
4-18.
M10 Locking nut
Mark the location of the seismic bracket holes on the concrete floor.
Remove the seismic bracket.
Drill holes in the concrete floor where you marked the locations of the seismic bracket holes using
a 1/2" carbide drill bit. Drill to a depth between 3 1/2" (8.9 cm) to 4" (10.2 cm).
Blow the dust out of the holes using a can of compressed air.
Place the seismic bracket back into place, with the holes in the bracket aligned with the holes in the
floor, and the bracket slot between the levelling foot and the display structure base.
Assemble two of the seismic anchors with nuts and washers so the top of the nuts are flush with the
top of the anchor. Place the anchors into the seismic bracket and use a hammer to drive the anchor
into the hole until the washers and nuts are tight against the bracket.
Use a 3/4" wrench to tighten the two anchors.
Repeat steps
a.
through
i.
Chapter 4
Installing And Performing Initial Leveling of the Main Display Structure
Figure 4-16
for each of the remaining rear seismic brackets.
illustrates steps
e.
through
h.
OL-27038-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents