Chapter 1
Overview, Required Tools, Preinstallation Checks, and List of Hardware Fasteners
After you install the reflector wall, continue the installation of the system by completing the steps in
Step 2
Chapter 4, "Installing And Performing Initial Leveling of the Main Display Structure."
Step 3
Continue the installation steps in sequential order, skipping
Reflector Wall Structure."
Instructions for Systems That Use a Free-Standing Reflector Wall
To install a system that uses a free-standing reflector wall, start at
Initial Leveling of the Main Display
book sequential order.
OL-27038-01
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
Chapter 6, "Installing the Free-Standing
Structure,", and continue the installation steps from that place in the
Installation Overview
Chapter 4, "Installing And Performing
1-11