Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual page 74

Table of Contents

Advertisement

Installing and Leveling the Display Structure
From the rear of the structure, connect the tie bars to the center structure by inserting M8 x 35mm screws
Step 5
through the tie bars and loosely securing them.
Do not fully tighten the screws until you perform final leveling of the entire display structure.
Note
Note that the longer screws attach horizontally through the tie bars.
Note
Key Part Description
1
M8 x 35mm pan head screws
Figure 4-8
Connecting the Tie-Bars to the Structure
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4-10
Chapter 4
Part/Kit Number
Qty
Ctn
48-3008-01
8
6
Kit #69-2366-xx
Installing And Performing Initial Leveling of the Main Display Structure
Notes
OL-27038-01

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents