Chapter 4 Installing And Performing Initial Leveling Of The Main Display Structure - Cisco TelePresence System TX9000 Assembly, Use & Care, And Field-Replaceable Unit Manual

Table of Contents

Advertisement

Installing And Performing Initial Leveling of the
Main Display Structure
Revised: May 20, 2015, OL-27038-01
This chapter describes the steps you perform to install the display structure and includes the following
sections:
Installing and Leveling the Display Structure, page 4-2
Installing Seismic Brackets (Optional), Part Number CTS-TX9K-SEISMIC=, page 4-15
Caution
The display structures are unstable during assembly. Use caution, and support all structures as required.
Some system components have metal edges with hard angles. These edges are exposed until you
Caution
complete system assembly. Use caution when you move around the system during assembly to avoid
contact with any exposed system edges.
Only trained and qualified personnel should be allowed to install, replace, or service this equipment.
Warning
The directions left and right refer to the assembly as you face the displays.
Note
OL-27038-01
Cisco TelePresence System TX9000 and TX9200 Assembly, Use & Care, and Field-Replaceable Unit Guide
4
C H A P T E R
4-1

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cts-tx9000Telepresence system tx9200Cts-tx9200

Table of Contents